Projects

MOST RECENT PROJECTS EXECUTED

S/N JOB DESCRIPTION CLIENT CONTACT REMARK  
1 Oily Water Treatment 2013 TOTAL Chigbo Ozumba 08033382109 Ongoing  
2 Souk EGGS1 IC & A contingency Work 2013 SPDC Emmauel Ojediran Ongoing  
3 Call Off Contract (Provision of E & I Upgrade in Swamp II) 2013 SPDC Arowosafe Toba 08070322661 Ongoing  
4 EPG – TPEF Gbaran Ubie modification project 2013 Intech/SPDC Emma Ojediran Sohail Khan 08166757715 Ongoing  
5 Agbada 2 Gaslift Manifold Upgrade (2011) INTECH/SPDC Chidi Nebo 08070322546 Completed  
6 Oredo  Gas Plant NAG E & I Modification Work Network Oil/NPDC Cliffold  08063110243 Completed  
7 Rehabilitation of Environmental Upgrade Swamp Stations (Nembe 1, 2, 3, & 4 )   2011 SPDC Arowosafe Toba 08070322661 Completed  
8 Rehabilitation of Environmental Upgrade Land Stations (Obele, Rumuekpe, Kolo Creek & Agbada 2 ) 2 011 SPDC Arowosafe Toba 08070322661 Ongoing  
9 PSV Calibration and Recertification  (2010 - Date) West Africa Gas Pipeline Mark Ukpai 07034142686 Completed  
10 Servicing & Recertification of Ball valve, Control valve, PSV etc. Century Energy Tamubnobere Ambrose 08063254778 Completed  
11 PSV Recertification at ABO FSPO Prosafe Ltd Chris Vann 012750146 Completed  
12 IRI-Gas Plant Well Head Cluster (Control Panel )Installation & Commissioning NAOC Lucky Okochi Completed  
13 Ovade-Ogharefe Gas Utilization Project E&I Installation  2009 PAN-OCEAN P.O No.  7702-POOC Yinka / Jude Completed  
14 IME GAS LIFT Well 9, 10 & 11 Electrical & Instrumentation Hook-up  2009 TOTAL NIG. P.O No. 4260004235 Ajibo Edwin 08033946067 Completed  
15 Electrical & Instrumentation up-grade for Ekulama 1 Flow Station 2009 SHELL NIG. P.O No. 4510104123 Toba 08070322661 Completed  
16 Electrical / Instrumentation Installation Work for ABO FPSO Extension Project  2009 PROSAFE /NAOC P.O No. 09ABO12241232 Kola Completed  
17 OBAGI Chemical Injection Skid Control Panel Design, Procurement, Construction, Installation and Commissioning  2008 TOTAL NIG. P.O No. 4960004561 Ajibo Edwin 08033946067 Completed  
18 OBAGI End Facility Hook-up - Well head control panel Construction and Installation 2008 TOTAL NIG P.O No. 4960013406 Ajibo Edwin 08033946067 Completed  
19 Safe Guard & Control System for I/A Sale Manifold 2008 SHELL NIG. P.O No. 451020247 Toba 08070322661 Completed  
20 IBEWA Well 15/16 E & I Hook-up 2007 DBN / TOTAL NIG Onuwa Kingsley Completed  
21 Safe Guarding System for Utility Gasline at Imor 1 & 3 Flow Station 2007 SHELL NIG. P.O No. 4510092886 Toba 08070322661 Completed  
22 Electrical / Instrumentation Installation Work for Produced Water Flow System De-Bottle-Necking at TEBIDABA and Ogbobini Flow Station. AGIP OIL CO. P.O. No. 4500002535 Lucky Okochi Completed  
23 Cleaning, Hydrotest and N2 Purging of 6” x 22km Pipeline Global Gas Peggle 084230727 Completed  
24 IBEWA C2 (Well 19) for Electrical and Instrumentation Hook-up  2009 TOTAL NIG. P.O No.  NG/6000/C&P/08  (2 Ajibo Edwin 08033946067 Completed  
25 Provision of Elect and Instr. Facilities at the Pig Station. GGRL P.Diaz 084230727 Completed  
26 IME Gas Lift Lines E & I Contract No. NG4163/C&P/06 EPNL Edwin Ajibo 08033946067 Completed  
27 Obagi Chemical Injection Skid Renewal EPNL Oby Akanu Completed  
28 AFIA Well 18 Hook-up (E & I) EPNL BABA Smittu Completed  
29 E & I Material Procurement EPNL Omubo Owuso Completed  
30 Ekulama E & I Environmental Up-grade SPDC Raimi  O. Completed  
31 Procurement and Services of SDV and Control Valve.  2009 CENTAURY ENERGY P.O No.  AP-2009-PR041 Ambrose Tami Complete  
32 Workshop Servicing/ Repairing and Calibration of PCV and PSV West Africa Gas Pipeline Douglas   Mckenzie 07034118972 Completed  
33 Procurement and Recalibration of 36 pcs of PSV ADDAX Petroleum Production Ltd Johnson Igwe Completed  
34 Skills Acquisition within 90-180 days on
  •   Instrument Fitting
  •   Instrument Calibration
  •   Valve Repair
  •    Industrial Electrical Installation
  •    Specialize  Course are Available on Request